| Product |
Pricing |
| Poly-Soy satin Gallon |
$45.95 |
| Poly-Soy satin 5 Gallons |
$224.75 |
| Poly-Soy gloss Gallon |
$46.95 |
| Poly-Soy gloss 5 Gallons |
$229.75 |
Poly-Soy:
Why Use A Durable TopCoat System like Poly-Soy?
Whenever a substrate is exposed to elements that contribute to staining or premature wearing, a durable topcoat system will provide an additional barrier that extends the life and beauty of the substrate. In addition, many substrates or treated materials require a protective shield to lock-in components that may potentially bleed or is more susceptible to damage. Most porous substrates can additionally benefit from installing a penetrating sealer such as Acri-Soy Sealer to provide integral penetrating protection, then applying Poly-Soy for topical surface protection. This type of double protection is most beneficial with outdoor or commercial traffic decorative concrete applications.
PERFORMANCE FEATURES:
Bonds To Most Surfaces, Interior/Exterior Use, Replaces Polyurethanes, Self Leveling/Lap Mark Free, Replaces Lacquers, Significant Labor Savings, Virtually Odorless, Increases Surface Durability, Ultra Low VOC <25 g/l, Abrasion Resistant, Non-Flammable, Stain Resistant, Non-Hazardous, Enhances Substrate Beauty
PROTECTIVE TOPCOAT APPLICATIONS:
Decorative Floors, Plaster Walls, Wood Decks, Concrete Countertops, Cabinetry, Furniture, Painted Surfaces, Artistic Features, Wood Floors, Architectural Metals
ADHERES TO:
Concrete, Wood, Metal, Wall Boards, Coatings, Vinyl, Stone Tiles, Laminates, Fabric
POLY-SOY COVERAGE:
Poly-Soy will yield approximately 400 to 500 square feet per gallon depending on the porosity of the substrate and application method used.
CSI Divisions:
Division 7- Thermal & Moisture Protection, 07 1900 Water Repellents
Division 9 - Finishes, 09 9300 Staining & Transparent Finishing; 09 9400 Decorative Finishing
LEED Green Building Rating System:
Materials & Resources:
Building Reuse, MR Credit 1
Local/Regional Materials, MR Credit 5
Rapidly Renewable Materials, MR Credit 6
Indoor Environmental Quality:
Low-Emitting Materials, EQ Credit 4
TECHNICAL DATA:
Color: Milky White (Dries Clear)
Sheen: Satin or Gloss
VOC: < 25 g/l
Odor: Very Mild. Virtually Odorless Bio-Based Content: > 25%
Recommend Coats: Standard- 2 Coats, Premium- 3+ Coats
Installation Temperature: 40° F (4 C) to 120° F (49 C) Relative Humidity: 85% maximum, below 80% for best results.
Dry to Touch: 30 Min to 1 Hour - To Topcoat: 2-4 Hours
Open To Foot Traffic: 12 Hours Light, 24 Hours Normal
Full Cure: 5 to 7 Days (Depending on environmental conditions)
APPLICATION:
Apply by HVLP (high volume, low pressure) sprayer, ½” or 3/8” nap roller, 18” T-Bar applicator, 16” NylFoam pad applicator, or foam pad brush. 2 coats standard, 3+ coats for enhanced protection or sheen.
Surfaces must be clean, dry, and free from all contaminants such as dirt, dust, debris, oils, grease, etc. If applying over new coating systems, follow all manufacturer dry time requirements prior to applying Poly-Soy.
Perform a small test area for compatibility and bonding prior to full project installation. Since full cure is typically 5-7 days, you are simply looking for desired appearance and good signs of bonding that will not remove easily when wiping with a clean cloth. When you are satisfied with the results, proceed to full system installation. Apply Poly-Soytm in thin, even coats using an applicable installation tool. Avoid puddling or over saturation to avoid improper curing. Allow 2 - 4 hours intercoat dry time, depending on environmental conditions. Higher humidity and cooler temperatures may take longer than the standard intercoat times. Lower limits may be reached by using fans to circulate the air for indoor applications.
Complete Poly-Soy Installation Guide
Optional Tools & Supplies:
Professional Mechanical Equipment
Pressure Washer, Floor Buffer with Red and Black Pad, Commercial Wet/Dry Vacuum, High Volume Low Pressure (HVLP) Sprayer (Pressure Pot System w/HVLP Gun), Black & Decker HVLP Sprayer, Floor Fans.
Manual Applicators
18” T-Bar Lightweight or Heavyweight Floor Coater, 16" NylFoam Pad Applicator, 18" Paint Tray, 3/8" Lint Free Roller, 4” or 6” Super Fine Roller, Fine Finish Pad Brush.
Miscellaneous Tools & Supplies
Masking Tape, Painters Tape, Clean Rags.
May be used on Interior or Exterior Substrates: Concrete, Masonry, Wood, Stucco, Plaster, Fiber Cement, Adobe, Brick Pavers, Natural Stone, Tile, Metal and more.
The Function of Poly-Soy Protective Clear Topcoat Finish:
Poly-Soy is an eco-friendly polyurethane and lacquer alternative technology that provides a clear abrasion, moisture, marring and stain resistant topcoat finish. It is virtually odorless and utilizes a soy ester dispersion technology for maximum penetration and bonding. Use Poly-Soy as a stand alone topical system over existing substrates or for enhanced substrate protection, apply over our penetrating Acri-Soy Sealer for both integral and topical substrate protection. A topical barrier is used when penetrating systems are not possible and/or when an abrasion resistant finish is desirable to protect it against damage or premature wearing. Poly-Soy may be used for interior or exterior applications and is available in a satin or gloss sheen finish.
Surface Preparation:
Proper surface preparation is critical to a successful long term and beautiful installation.
Surfaces must be clean and free from all oils, grease and contaminants that may prohibit proper bonding. Degrease: We recommend degreasing with our bio-based SoyFast Concentrated degreaser to remove all oils, residues, and contaminants from the surface. Apply SoyFast liberally at 1:1 heavy duty, 10:1 medium duty or 20:1 light duty. Power Wash clean or apply and rinse by hard bristle brush or floor machine with a black stripping pad. Use a wet/dry vac to extract the solution and allow to dry.
Poly-Soy Application:
If applying Poly-Soy over an existing stain system other than SoyCrete or TimberSoy, be sure to test for compatibility and follow all manufacturer dry time instructions for a topcoat installation. It is recommended to install a minimum of 2 coats for best results. When using Poly-Soy Gloss, additional coats will increase sheen level. If the surface is very porous, you should first apply Acri-Soy Sealer to maximize spread rate and minimize the number of Poly-Soy topcoats when trying to achieve high gloss sheen.
Allow approximately 2-4 hours intercoat dry time between coats. You want each coat to have adequate drying and hardness to maximize distinctive layers of protection. Otherwise, premature application of topcoats will emulsify with the previous coat simply making it a thicker one coat application. You want to achieve multiple layers of protection for maximum durability and sheen level. To expedite drying time to the lower recommended limits for indoor applications, introduce air flow and circulation by using fans.
Application Methods:
Always perform sample tests using your desired method to determine repeatable spray techniques, strokes, rolls, etc that delivers the applicable amount of material without puddling or leaving undesirable lap marks. Unlike most polyurethane or lacquer products, Poly-Soy is self leveling and will not require sanding between coats for most applications. While Poly-Soy is self leveling, it still requires care, quality application methods and proper applicator tools to deliver a flawless finish. If sanding is desired, simply allow the material to dry per recommended dry times.
HVLP Sprayers- Adjust to a fine mist spray that delivers a uniform and puddle free application. If puddles occur, simply back roll with an applicable roller.
18” T-Bar Floor Applicator- Pour Poly-Soy in a straight line along a starting wall or line. Angle the T-Bar slightly as you walk pulling the T-Bar. The weight of the bar will distribute Poly-Soy in a thin coat while moving excess away from the path for your return pass. Repeat. Be sure to work out any lap marks caused by excessive puddling.
16” NylFoam Pad Applicator- Pour Poly-Soy into an 18” paint tray. Evenly saturate pad then apply in 3' wide passes in a thin even coat to ensure that you avoid creating puddles or lap marks. Continue the process by overlapping the wet edge making sure to level the material avoiding thicker coats at each wet edge pass.
Super Fine Rollers- Pour Poly-Soy into an applicable sized paint tray. Evenly saturate the roller, and then apply in 3' wide passes in a thin even coat to ensure that you avoid creating puddles or lap marks. Continue the process by overlapping the wet edge making sure to level the material avoiding thicker coats at each wet edge pass.
Fine Finish Foam Pad Brush- Since a brush application is generally used for smaller areas and more delicate finishes, extra care should be observed to eliminate the need for sanding between coats for best results. Pour Poly-Soy into an applicable sized paint tray. Saturate the pad brush evenly and blot out excess material. Brush on material with smooth strokes and consistent pressure. Be sure to level material for even distribution and self leveling of the product.
Dry Time & Curing Process:
If applying over a newly installed SoyCrete, TimberSoy, or Acri-Soy installation, make sure these systems have had a minimum of 6 hours dry time. When applying Poly-Soy allow approximately 2-4 hours between coats. The surface may be suitable for normal foot traffic or use within 24 hours, but not recommended prior to 12 hours. Premature and unpredictable traffic or use may compromise the curing process and possible reapplication may be required. Allow approximately 5-7 days prior to vehicular traffic to avoid hot tire pick-up. A fully cured system is hot tire pick-up resistant suitable for vehicular traffic. Full curing of the installation is approximately 5-7 days depending on environmental conditions. Avoid accumulation of standing water or washing with chemical detergents during the curing period.
Basic Trouble shooting:
White Residue: We recommend shutting off all irrigation that may affect an outdoor installation during the curing period. Avoid installation of Poly-Soy during rainy forecasts for outdoor installations. Poly-Soy has a very fast resistance to moisture exposure, however, all precautions should be observed to minimize risks of negative effects. If Poly-Soy is subjected to standing water before the full chemical cure, it is possible to witness a white milky substance. If this occurs, simply allow it to dry and reabsorb into the surface naturally. Wiping or cleaning this substance will remove the uncured Poly-Soy. Should this happen, simply re-apply Poly-Soy to the affected area. Lap Marks- These are caused by over application of product, improper technique or applicator tool used. Lap marks are puddled material formed at the wet edge that was too heavy to self level. When observed during installation, simply level the material with an applicable roller. If you have allowed the material to dry with lap marks, you must sand the coat with a sanding disc. The sanding disc grit level required is dependent on the degree of repair. It is always best to start with finer grit 220 or above and work your way down if extreme marking occurred.
Topcoat Finish Care:
Avoid using chemicals to clean the surface during the curing period and up to 14 days. Surfaces may be subjected to normal foot traffic or use within 12-24 hours depending on environmental conditions. Use caution and avoid dragging equipment, furniture, etc. over Poly-Soy during the curing period. Automotive traffic should allow a minimum of 5 to7 days for adequate cure to resist hot tire pickup. Pool environments should allow a minimum of 7-14 days before exposure to pool chemicals and standing pool water. Standard maintenance cleaning requires only the use of water and/or neutral cleaner. We recommend the use of micro fiber wet/dry mops for a chemical free maintenance of your newly sealed floor. You may also use a floor buffer with a polishing pad as part of your floor maintenance program. When signs of wear become visible, you may either recoat the entire surface area repeating the installation steps, or simply perform spot repairs by light sanding and cleaning then applying Poly-Soy to the area being repaired.